S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
136. The authorization holder must install a conductor casing if
(1)  the surface casing is laid at a true vertical depth exceeding 650 m;
(2)  it is foreseeable that a petroleum zone will be intersected before reaching the laying depth of the surface casing; and
(3)  an adjacent wellbore encountered groundwater flow on the surface.
The conductor casing must be set in a competent formation.
If a shallow aquifer presents artesian pressure conditions, the conductor casing must be set directly above the aquifer.
O.C. 1251-2018, s. 136.
In force: 2018-09-20
136. The authorization holder must install a conductor casing if
(1)  the surface casing is laid at a true vertical depth exceeding 650 m;
(2)  it is foreseeable that a petroleum zone will be intersected before reaching the laying depth of the surface casing; and
(3)  an adjacent wellbore encountered groundwater flow on the surface.
The conductor casing must be set in a competent formation.
If a shallow aquifer presents artesian pressure conditions, the conductor casing must be set directly above the aquifer.
O.C. 1251-2018, s. 136.